At 5:23 am on 26 April 1966, an earthquake struck Tashkent. Its magnitude was about 5.2–5.3, but shaking in the centre reached an intensity of around eight: the earthquake had a shallow focus beneath the city. Large-scale reconstruction followed, reshaping much of Tashkent’s housing.
The city has grown considerably since then, yet flat buyers still return to the events of 1966. Some look for Soviet-era buildings; others trust only new cast-in-place concrete buildings. How can you check a building before buying? And where do you start when you already live there but know little about its condition beyond what the neighbours say?
What does “intensity nine” in an advert mean?

Property adverts often give a seismic intensity rating for a building. The terminology can be confusing: reports of an earthquake give both its magnitude and its intensity. Magnitude describes the event itself; intensity describes its effects at a particular location. Intensity varies with distance from the source and local ground conditions.
The advertised “nine” refers to design seismic intensity — the conditions the building was designed for. Ask the developer to show you the intensity used for this particular building and where it appears in the design. You then need to check how that design was built and what condition the structure is in today.
During an earthquake, the ground moves with the foundations while inertia tends to keep the upper floors in their previous position. The building deforms. Floors, walls, columns and their connections carry the loads together, so an engineer considers the whole structure. In a panel building, that means the load-bearing panels and joints; in a frame building, the columns, beams and walls specified in the design. In a brick building, the engineer establishes which walls carry loads and how they connect to the floors. Even similar-looking blocks can differ in their foundations, workmanship and later alterations. Assessing a particular address requires its design and information about its condition.
Before buying: the paperwork for your block

For a new development, request the design and approval documents from the sales office. Start with the official project name, address, block or construction phase, and the developer’s legal name and tax identification number. Neighbouring blocks in a large complex may be built at different times under separate approvals. Check that the documents cover your chosen block; where a document covers several buildings, look at the list of properties included.
Find the QR code on the construction-site passport. It helps you check the address and the organisations involved: the client, contractor and designer. Next, request the number and date of the positive expert-review conclusion on the design, along with the registration details for the start of construction. The review includes seismic-resistance requirements. Under the Urban Planning Code, a positive conclusion becomes valid after entry in the unified register.

You can check these details in Shaffof qurilish’s open data. There are separate registers for expert-review conclusions, registration of construction works and occupancy permits. Search by the official name, district, document number and date: the marketing name may differ from the registered name. Compare the entry with your block and the seller’s paperwork.
A register entry may contain only reference details and a short description. Request the design, plans and full review information from the developer. If no entry turns up, confirm the official name and ask for a written explanation. An unavailable QR passport or conflicting information also needs to be explained.
An extension or altered ground-floor structure is a reason to request the amended design and a positive repeat expert review. Additional floors are subject to a stricter rule: since 1 January 2026, it has been prohibited to approve additional storeys or increased height for an apartment building already under construction. When twelve storeys replace the original eight, establish when the change was approved and when construction began. A promise to approve the increase later conflicts with that restriction.
An occupancy permit for a block still under construction comes after completion. When buying at this stage, check exactly what you are paying for and the deadline written into the contract. Go through the flat’s documents and the terms of the transaction with a notary or lawyer; approvals for the entire complex cover only part of a buyer’s concerns.
The building is finished: before moving in

A completed building needs an acceptance certificate and an occupancy permit under the Urban Planning Code. Look for the permit in the relevant Shaffof qurilish register. Keys may already have been handed over and neighbours may be decorating, but lawful occupancy still requires the permit.
The documents will also be useful when inspecting the finished building. Before hiring a structural engineer, agree on the task: to examine the accessible parts of the structure and establish whether a more detailed survey is needed. A flat handover inspection covering finishes, windows and sockets usually has a different scope; check what the service includes before the visit.
Point out cracks, damaged concrete, exposed reinforcement and signs of prolonged leaks. Arrange access to common areas. Finishes conceal much of the structure, and assessing the earthquake resistance of the whole building may require the design, measurements and calculations. The first visit therefore produces findings about the areas inspected and identifies further checks, including access to a basement or other locked spaces.
Before paying, confirm that the documents cover your block, design changes have been approved and a finished building has an occupancy permit. Refusal to provide reference details, confusion between blocks, undocumented changes or an offer to move in without a permit are reasons to postpone the purchase. Discuss any damage separately with the engineer: design review and the quality of the completed work are checked at different stages.
Getting to know an occupied building

An older building has a history of repairs, leaks and alterations. Both prospective buyers and current residents need that history. Ask the management organisation or owners’ association for the technical passport, the design or building-series details, previous survey reports, and records of major repairs and strengthening. Check which recommendations from earlier reports were carried out and what happened to the building afterwards.
The construction year helps locate the original design. Its condition today also depends on the structure itself: a building may have survived an earthquake decades ago and subsequently undergone changes the original design never allowed for. For a panel block, ask whether load-bearing panels and joints were surveyed and how damage was repaired. For brick buildings, find out about the walls, floors and their connections. For frame buildings, establish what has changed around columns, beams and structural walls. An engineer confirms the structural system using the design and an inspection.
Look closely at ground-floor alterations. Several rooms may have been combined into a single retail unit, for example. Which structural elements were removed? What design governed the work, and was strengthening required? Any completed strengthening should have records of the work and its acceptance. The issue is the structural intervention, whether the space became a shop or remained a flat. New openings, combined flats, extensions and added storeys raise the same questions.

Neighbours who have complained about water for years may know most about the basement and roof. Request reports of flooding, leaks and repairs: where the water came from, how the source was dealt with and whether affected areas were examined. Persistent damp can damage materials and accelerate reinforcement corrosion. Heavy structures added beyond the original design also introduce loads that must be included in calculations.

The management organisation may hold only part of the old archive. During a survey, missing information can be recovered through measurements and investigation of materials and structural elements. Meanwhile, neighbours can collect repair dates, locations of alterations and photographs of damage. That history helps the engineer decide which areas need attention first.
You have found a crack. Where do you start?

A crack often draws attention before anyone searches for the paperwork. Its significance depends on its position, the wall material, its direction and development, and the condition of nearby elements. An engineer needs to establish whether it affects the finish or the structure and why it appeared. There is no universal width in millimetres beyond which every crack becomes dangerous.
Falling structural parts, pronounced deformation, sounds of collapse, fire or a smell of gas call for urgent action. While shaking continues, do not rush to the exit: drop to your hands and knees, take cover under a sturdy table and hold on, protecting your head and neck. Once shaking stops — or during an emergency without an earthquake — leave by an available safe route and call 112 from a safe distance. If you smell gas, do not touch switches or electrical appliances; make the call outside. Return to a damaged building only when specialists say it is safe.
With no signs of immediate danger, record the damage. From a safe position, take an overall photograph and a close-up with a scale, and note when you noticed it. Add the circumstances: recent shaking, work next door or water appearing. Find an older photograph of the same area for comparison. Leave opening up the wall to a specialist.
A new or growing crack, visible deformation, damaged concrete or masonry, exposed rusty reinforcement or a joint between panels that is opening up needs professional attention. Include a suddenly sticking door in your description alongside other changes. These observations help the specialist decide what to inspect and how extensively.
Arranging a check of your building

If there is no immediate danger, write to the body managing the building. Add questions about previous surveys to your photographs and description of the damage. Register the request so you have a record of the date you reported the problem and can obtain a written reply.
You could write: “Please tell us when the building at … was last surveyed, who carried out the survey and what it found. What recommendations were made, and which were carried out? Please arrange an inspection of the crack in … and tell us whether a structural survey is required. Dated photographs are attached.” For an altered space, also request information about the design changes, expert review and records of completed and accepted strengthening. Keep a copy and confirmation of receipt.
Since 2026, building management bodies have been responsible for arranging visual and instrumental technical surveys of apartment buildings. Decree PF-236 provides for payment from local budgets. Ask your management organisation about the procedure and timing. A further investigation that owners wish to commission themselves is discussed separately, including its scope and funding. Bring this to a general meeting: load-bearing structures are common property belonging to all owners.
If management fails to answer the substance of your request, or you suspect breaches of construction requirements, contact the Inspectorate for Control in Construction and Housing and Communal Services. Its official contact page has a “Send an appeal” button and the call-centre number +998 71 200-69-02. Give the building’s address, describe the problem and attach photographs and your correspondence with management. Explain what happened and what action you have already taken.
What a building survey should deliver

Start by defining the survey’s purpose. Finding the cause of cracks, assessing ground-floor alterations and establishing whether a building can remain in use are different tasks. If you need an answer about earthquake resistance, state this explicitly in the technical brief. Discuss the task with the firm before signing a contract. Ask about its experience with similar buildings, who will do the work and which methods they will use.
Uzbekistan’s survey procedure is set out in ShNQ 1.04.01-23. Specialists first study the documents and inspect the building. They then establish what information is missing and whether a detailed instrumental survey is needed. This may include measurements, material-strength testing, investigation of reinforcement, opening up selected areas, examining foundations and structural calculations. The work is chosen to suit the building and the question being asked.
Record the address, purpose, scope of work, accessible spaces and expected output in the contract. Discuss a locked basement or missing design in advance: how will the firm obtain the missing information, and what will remain outside its conclusions? Findings about part of a building cannot be applied to the whole structure. An offer to issue a report without examining documents and visiting the building is a reason to find another firm.
The finished report should identify the elements examined, defects found, investigation results, an assessment of the building’s technical condition and recommendations. Look for the answer residents need: can the building remain in use, and under what conditions? Ask the engineer to explain the condition category, restrictions and required action — repairs, strengthening, monitoring or further investigation.
Since 2026, reports based on instrumental technical surveys of apartment buildings must undergo urban-planning expert review. Continued use of the building is permitted only with a positive conclusion. Request the reference details of both documents from the management body.
Discuss implementation of the recommendations with management. Strengthening requires a design and organised works; monitoring needs a schedule and a responsible specialist. Assign people and deadlines for urgent measures. After the work, the result is checked in the manner specified by the design and contract.
There are things to check inside the flat, too

While the paperwork is being assembled, look around your flat. A wardrobe, mirror or shelf over a bed can injure someone during shaking even when the building’s structure remains intact. You can secure these items now.
Secure tall furniture using fixings suitable for the wall; ask a tradesperson for help choosing them. Move heavy objects to lower shelves and clear anything that could fall from above beds. Find the nearest shelter under a sturdy table in each room, away from windows and unsecured furniture.
Discuss with your family what you will do after the shaking: where to meet if family members are apart, and whom to tell that you are safe. Keep water, a torch, essential medicines and the rest of your emergency supplies somewhere accessible. Choose the contents for the people and animals you live with, including children, older relatives and pets.

During an earthquake

Indoors, drop to your hands and knees, take cover under a sturdy table and hold on, protecting your head and neck. Without a table nearby, cover your head and neck with your arms and stay away from windows and falling objects. Do not run down stairs or use a lift while the shaking continues. An ordinary doorway offers no advantage over suitable shelter.
Outside, move away from façades, trees, poles and wires towards open space. The area by a building entrance is exposed to falling glass and cladding.
Once shaking stops, check whether anyone needs help and follow emergency-service instructions. In a fire, with a smell of gas or serious structural damage, leave by an available safe route; call 112 from outside at a safe distance. Do not touch switches or electrical appliances when a gas leak is suspected. Return to a damaged building only with permission from specialists. Take cover again during aftershocks.
If you have already had your building checked, tell us in the comments which records you found, who carried out the survey and whether repairs followed.
Sources
- Construction inspectorate: contacts
- Law on the management of apartment buildings
- Emergency ministry: call 112
- Academy of Sciences: the 1966 Tashkent earthquake
- Institute of Seismology: 26 April 1966
- Scientific paper on the 1966 Tashkent earthquake
- CDC: earthquake safety
- USGS: earthquake facts
- World Bank: earthquake risk in apartment buildings
- USGS: magnitude and intensity
- Shaffof qurilish: public registers
- Decree PF-236: rules applying from 2026
- Earthquake Country Alliance: family planning
- Urban Planning Code
- Earthquake Country Alliance: preparedness plan
- Regulation 3672: construction-site QR passports
- Resolution PP-158: seismic safety
- ShNQ 1.04.01-23: building surveys
- USGS: what to do during an earthquake