On 22 October, a 20-year-old student was struck while using an unsignalised crossing on the Small Ring Road near Farkhad market. She died in hospital.
In the first half of 2026, the Interior Ministry recorded 420 road crashes in Tashkent, including 355 involving pedestrians. The same report lists 26 fatal crashes.
The report gives no breakdown by crossing type — these figures cannot tell us how safe an individual zebra crossing is. Assessing a particular place takes other information: how many lanes people must cross, how fast vehicles travel, whether drivers can see someone waiting, and whether there is a convenient route to the other side.
Together, those details shape the walk to a bus, shop or park.
Zebra markings between fast lanes

On a small street with light, slow traffic, a crossing without signals can work well. A person can see an approaching car, the driver can see them, and the distance across is short. Across six lanes, someone on foot has to watch several vehicles at once and spend longer in the carriageway.
A dangerous moment arises when a car in the nearest lane stops but another keeps moving alongside it. The first vehicle can hide the pedestrian until too late. A van parked near the crossing can also block sightlines before someone even leaves the pavement. The US Federal Highway Administration, FHWA, considers markings alone insufficient on busy multilane roads.
Under Uzbekistan’s traffic rules, a driver approaching an unsignalised crossing must slow down or stop to let pedestrians crossing the carriageway pass. Pedestrians must assess vehicle distance and speed and make sure it is safe to cross. Visibility and time to react depend on street design: both people need to notice each other before their paths meet.
That is why WHO recommends 30 km/h where motor traffic mixes with people walking and cycling. At a lower speed, a car travels less during the driver’s reaction time, needs less braking distance, and a possible impact is less severe. Street layout and enforcement help achieve that speed; oversized lanes and a long straight approach encourage the opposite.
On smaller streets, a crossing can be raised to pavement level. Vehicles climb a gentle ramp and slow down; people cross without dropping to road level. Drainage and the ramp profile need proper design, with separate consideration for bus and emergency routes. A wide, fast arterial needs a different combination of measures, including traffic control, protected waiting space and a shorter distance across lanes.
London shows how such work can be assessed citywide. TfL studied more than 150 neighbourhood schemes with a 20 mph limit, roughly 32 km/h. Deaths and serious injuries at those sites fell by 34%, against a background reduction of 15%. The study assesses the traffic schemes as a whole. A useful lesson for Tashkent is to measure actual speeds and severe injuries after changes, then refine the street using those results.
From one pavement to the next

Where a wide road cannot yet be narrowed, people can be given a protected place halfway across. A refuge lets them cross one direction of traffic, then the other. They do not have to find a gap in both directions at once or judge whether they can cover the entire road in one go.
A proper refuge has raised edges, a protective nose and enough room for people waiting. It should fully accommodate a person with a pushchair or using a wheelchair, without leaving wheels in a traffic lane. Its clear passage should continue the crossing line; a pole or button should not obstruct it. A triangle painted on the asphalt does not provide that space.
First, though, people have to reach the refuge. A high kerb, a step at a ramp or a grate across the route can break the whole journey. Someone with impaired vision also needs a detectable road edge, tactile warning and a clear signal indicating when to cross. Yellow paving that ends at a pole does not fulfil that purpose.
Uzbekistan’s SHNQ 2.07.02-24 accessibility standard already covers continuous links between footpaths, crossings and stops, tactile surfaces and audible information. At points where pedestrians and vehicles meet, the kerb edge must be no higher than 2 cm. A smooth, flush ramp is easier to use and should remain clear at both ends.
A stop near Chilanzar metro illustrates how much one detail matters. On 6 April, the traffic management centre said it had brought a high kerb into compliance and installed tactile paving following a report about access. The high edge had been an obstacle on the final stretch to the bus.
How long until the green?

That route also needs enough time. A signal should allow someone to reach the far side or a protected refuge at a comfortable pace. Timing that suits a fast adult carrying nothing can feel very different to an older person or a family with a small child. US signal guidance recommends allowing for slower walking where slower pedestrians regularly use a crossing.
A green signal can still create a conflict: people may be allowed to walk while cars turn across their path. A driver may be watching opposing traffic or looking for a gap while someone is already crossing. The movements can be separated in time, through an exclusive pedestrian phase or by prohibiting the conflicting turn during it.
Another approach gives pedestrians a head start of 3–7 seconds before vehicles receive green. By then, people are established and easier to see on the crossing. Geometry helps with turns too: a tighter corner encourages a lower speed, while removing parking near the approach opens sightlines.
New York specifically slows turning vehicles at junctions. Low dividers and posts shape the vehicle’s path and stop drivers cutting the corner at speed. The city’s transport department reports 18% fewer pedestrian injuries and 33% fewer severe injuries at programme sites, with improvement outpacing comparable nearby locations.
Tashkent is trying new equipment too. On 29 June, its traffic management centre announced a pilot on Osiyo Street: pressing a button activates bright flashing yellow beacons near the crossing. These attract drivers’ attention but do not give vehicles a red signal; the crossing remains unsignalised.
Results of the local evaluation have not yet been published. The useful questions are whether drivers yield in every lane, speeds have fallen and people are visible after dark. At a signal-controlled crossing, waiting time and whether people can finish without running also matter.
Why the climb up or down?

Separating pedestrians and cars vertically removes their direct conflict at the crossing: people go above or below the road. It also adds stairs and distance to their journey, and gives the city a structure to light, clean and repair.
Two flights of stairs can be a serious obstacle for someone with painful knees. A pushchair or wheelchair needs an accessible way up. If the entire route relies on one lift, a breakdown effectively closes it to some users. A long ramp takes space and adds distance; a tunnel also needs drainage and clear sightlines at its entrances and exits.
FHWA recommends bridges and tunnels where separation is genuinely needed: across a motorway, railway, natural barrier or a very fast, busy arterial where no safe surface crossing has been found. Suitable terrain can shorten the climb and detour. On an urban street with shops and stops on both sides, a convenient surface route and a safe way to manage traffic deserve consideration first.

Tashkent already has an example at Amir Temur Square. On 8 July, the traffic management centre reported five signal-controlled surface crossings into the square. Some approaches had previously required underpasses; others involved crossing several lanes without signals. According to the centre, one crossing on the Palace of Forums side was more than 30 metres long.
The redesign added signals and, on wider sections, refuges. Broadway is once again linked to the square at street level. The surface route removed the compulsory descent and climb for people unable to use stairs.
In a report published on 9 July, Gazeta’s correspondent described a 76-second wait at one crossing during a visit on 3 July. The surface route removed the need to use stairs, but its convenience also depends on the signal cycle.
The other side is still a long way off

Waiting adds to the distance needed to reach the crossing itself. A shop can be directly opposite a home while the permitted route is far to one side. A short everyday trip then gains a detour that is particularly noticeable with heavy bags, a small child or a walking stick.
For example, if two crossings are 500 metres apart, someone in the middle must walk 250 metres to one and 250 back along the opposite side. That is half a kilometre of detour to reach a place directly opposite. This is the geometry of an illustrative street; a real route can add signal waits and stairs.
Uzbekistan’s SHNQ 2.07.06-24 street-design standard specifies crossing intervals of 300–500 metres, taking pedestrian flows into account. The international Global Street Design Guide recommends much more frequent surface connections in urban areas, roughly every 80–100 metres along desired routes. The first governs local design; the second offers an approach to a convenient urban walking network.
Near a school, market, clinic or stop, entrances and pavements show where everyday routes lead. That is where a crossing is needed. Sending people to a distant gap in a fence lengthens the journey. A site assessment therefore needs to include neighbouring blocks: where people come from, where they need to go, and how long the permitted route takes.
Reaching the bus during roadworks

Many routes converge at a stop. A footpath and crossing lead to it, while a cycle lane or driveway may run alongside. On the approach to the bus, people need to see where a car or bicycle could come from and where its path meets theirs.
This matters for the new BRT routes too. The traffic management centre announced works on Yangi Sergeli Street and Amir Temur Avenue from 25 October. Our article explains how BRT works and how it differs from a tram. People need to reach the future platform from both sides of the street, with a clear pedestrian route maintained during construction.
FHWA’s work-zone guidance calls for pedestrian routes to remain continuous and accessible, including at temporary crossings. In practice, that means a path separated from machinery, with clear entry and exit points, a firm surface and lighting. A temporary walkway ending at a trench or requiring someone with a pushchair to drop into a traffic lane breaks that chain.
Where to report a crossing

If a route near home needs fixing, start with a precise location. The traffic management centre accepts reports and suggestions through its bot, @codd_tashkent_bot, listed on its official channel. Send a map point, photos and a short description: a pole blocks the ramp, a parked van hides approaching traffic, or stairs stand between people and a stop.
For a formal request with a written response, use the Tashkent city administration’s form. Enter your details and contacts, keep the submission confirmation and date, and retain the registration number. If no number is shown, ask the administration for it. You can use it later to check the outcome.
Include a public landmark or map point, the direction of the journey and the obstacle. Say if people are heading to a school, market or stop. Take photos from a safe place on the pavement: an evening image can show lighting, a daytime one sightlines and parking. If signal timing is the problem, record the wait and the time allowed to cross.
Ask for a site assessment and a safe solution with reasons. The right measure should be chosen after checking speeds, flows and visibility: signals, a refuge, a tighter corner, lighting, a ramp or cleared sightlines. A useful response identifies the solution, responsible body and work schedule, or explains the alternative action chosen.
Under the law, a proposal is considered within a month. An application or complaint is normally considered within 15 days, or up to a month if further checks are needed. In an exceptional case, this can be extended by at most another month, with notice to the applicant. These are the statutory time limits for considering a submission. The timetable for rebuilding the street is separate, so “noted” still leaves the question of what will change and when.
Where is crossing difficult for you?

Tell us the street or a public landmark in the comments, and what gets in the way: a long detour, stairs, fast turns or a short green.
Send this to a neighbour or someone you often walk this route with. And claim your tazik — no stairs needed here 🧡